The project
CORROSION PROOFING CONCRETE / MEMBRANE FREE WATERPROOFING / PLASTICISERS / OIL & SOLVENT PROOFING / DUSTPROOFING / COLOR SEALING / EPOXIES / RAPID HARDENING / RETARDING / SURFACE HARDENING / MORTAR & DAMPCOURSE ADMIXTURES
Suntec City basically divided into 4 phases during construction time.
a. Ph 1 - The Diaphragm Wall is 800mm thick and approx. extending to 20m
below ground.
b. Ph 2 - Area approx. 90,000m2 with 2 levels basement.
c. Ph 3B & 4 - Consists of
- 6 level high Convention Centre.
- 1 no. of 18 stys office tower.
- 4 nos. of 44stys office tower.
- 4 level retail complex with giant water fountain.
- Approx. 50m long pedestrian underpass to link up Marina Square.
- Approx. 30m long pedestrian underpass to link up Millennium.
- 1 Olympic size suspended swimming pool.
Design constraints
1. A fast track project which construction time is limited.
2. Built on reclaimed land and specified membrane system to be employed in
basement.
Solutions
To save construction time, Contractors since Phase II had submitted our Everdure Caltite System as alternative waterproofing system to replace the membrane system as stated in the Specification. As it was totally a new approach and the use of admixture was not common at that time, therefore Consultants granted the greenlight only based on a commitment that Contractors had to establish a tight monitoring system during the whole construction process to ensure the best of the performance was achieved. A summary of the QAQC as follows: