Areas of Use:
4. The Festival Hotel - MC02.
a. Main Contractor: Kajima Tiong Seng JV
b. 3CC System to basement wall, 1st storey slab (partial), all water features
and suspended swimming pool.
c. Caltite System to water tanks.
d. Quantity supplied about: 3CC - 34,000m3.
Caltite - 1,000m3.
5. The Hard Rock Hotel - MC03.
a. Main Contractor: Low Keng Huat
b. 3CC System to basement wall and 1st storey slab.
c. Caltite System to all water features, suspended swimming pool and water
tank.
d. Quantity supplied about: 3CC - 27,000m3.
Caltite - 1,750m3.
6. The Universal Studio Singapore - MC04.
a. Main Contractor: China Jingye
b. 3CC System to all water features and suspended lagoon of Universal
Studio Singapore.
c. Quantity supplied about: 3CC - 97,000m3.
7. The Marine Life Park - MC05.
a. Main Contractor: China Jingye
b. Waterproofing system unknown
8. The Equartius Hotel, Oceanarium and Beach Villas - MC06.
a. Main Contractor: Sembawang
b. Caltite System to all oceannariums.
c. Caltite System to basement of Equartius Hotel.
d. Caltite System to Beach Villas.
e. Quantity: Caltite - 94,000m3.